PROCESS PLANT ENGINEERING
- Oil Refinery
- Gas Processing and Making
- Crude Desalting Plants
- Terminals
- Power Plants(including Geothermal)
- Environmental
Stages of a Typical Production Facilities(EPCC)
Project Management
- Multidicipline
- Specialist
- Planning and Execution
- Contract Management
Office Engineering
- FEED(PFD,UFD)
- Process & Utilities Design
- Topsides Process and Utilities Modules
- Ship Facilities
- Intergration
- Marine Ops
- 2D and 3D Details
Procurement
- Plant & Equipment
- Specialities
- Material
- Chemicals
Yard Fabrication
- Modules
- Ship Structurals
- Quarters
- Balance of Plant
Shipyard Construction
- Ship Modifications
(Deck,Machineries,Power Plants,Instrumentation,etc) - Ship Classicationx
- Storage Modifications
- Pipe Rack
- Between Modules Hookup
- Ship-Modules Tie-in
- Intergartions
- Commisioning
- Seaworthiness
Transportation
Offshore
- HU & Commisioning\
- Marine Spread
- Subsea Tie-in
TOPSIDES SYSTEMS AND SUBSYSTEMS
Living Quaters
- Accommodation
- Offices
- Medical Clinic
- Communications
- HVAC
- Ablution
- Messing
- Kitchen
- Gallery
- Store Rooms
- Helideck
- Sewage
- Control Room
Utilites
- Compressed Air
- Seawater(Electrochlorination and Caissons)
- Heating Medium(Steam)
- Potable Water(RO)
- Diesel
- Fuel Gas distribution
- Electrical Power(DG)& Lighting
- Hydraulic System
Process
- Risers,Launchers/Receivers
- Umbilicals
- Inlet manifold
- Separators(test,HP,LP)
- Produces Water Treatment(HC,IGF)
- Fuel gas Conditioning
- Gas Turbine Genrator
- Flares
- Crude Storage
- Closed Drain
- Open Drains
- Chemical Injection
- Future
- Gas Re-injection
- Sales Gas Export
- Water Injection
- Gas Sweetening
- Gas Dehydration
Life Preservation
- F & G Detection
- Deluge
- Personnel Fire fighting Equipment
- Foam System
- Survival Crafts
- FM200 Clean Agent
- Fire Monitors
- Fire Wall
Others
- Switchgear Room (battery Room)
- Laboratory
- Workshop
- Havaids
- Caissons(slop)
- Control System,Plant Shutdown Systems, F & G
- Pedestal Cranes
PLANNING AND EXCUTION
Planning
- Weather Reports
- Level 1 to Level 4 planning
- Work Norms
- Actual vs palnned
Resources
- Construction Crew
- Construction Equipments
- Work Tools
- Shore Base
Mechanical Completion
- by disciplines
- by systems and subsystems
- Task Force
- Certifications
Marine Spread
- Anchor Handling
- Life support
- Emergency
- Pre-offshore